| Projet |
Client |
Type |
Année |
| L'énergie et la production d'électricité |
| Extension of Thyna Power Plant STEG |
General Electric |
Projets en cours |
2008 |
 |
Project description :
- Civil works including:
- Earth moving, miscellaneous roads and network.
- Buildings.
- Concrete Stations.
- Turbine House
- Structural steel work .
- Electro mechanical Works.
|
|
|
| Extension of Feriana Power Plant STEG |
General Electric |
Projets en cours |
2008 |
 |
Project description :
- Civil works including:
- Earth moving, miscellaneous roads and network.
- Buildings.
- Concrete Stations.
- Turbine House
- Structural steel work .
- Electro mechanical Works.
|
|
|
| Station of compression gas : Sbeitla, Feriena, Korba |
Snamprojetti |
Projets achevés |
2007 |
 |
Project description :
- Civil works
- Mechanical works
- Electrical works
- Assistance and commissioning
|
|
|
| Early power generation |
ENI Tunisie |
Projets achevés |
2007 |
 |
Project description :
EPC for the construction of 24 Mw Power Generation
- Engineering
- Procurement
- Construction
- Commissioning
- Operation and maintenance
|
|
|
| GIS Metal Clad SF6 33 Kw M’saken - Sfax |
STEG |
Projets achevés |
2006 |
 |
Project description :
EPC for the construction of 24 Mw Power Generation
- Civil works, the installation of equipments
- Supply of the power cables 30 KV and frameworks supports.
- Supply of the cells armored
- Control System
|
|
|
| Power plant THYNA II(9E de 120Mw) |
General Electric |
Projets achevés |
2006 |
 |
Project description :
- Civil works
- Supply and installation structures room of the machines
- Installation electro mechanical
|
|
|
| Construction of 3 power plants :Sfax, Feriana, Goulette |
General Electric |
Projets achevés |
2002 |
 |
 |
Project description :
- Civil work including
- Buildings.
- Concrete Stations.
- Turbine House.
- Structural steel work.
- Electromechanical work.
|
|
|
| Maintenance of the gas station contract |
General Electric |
Projets achevés |
2001 |
 |
Project description :
|
|
|
| Steam turbines (THERMODYN) (Iraq) |
NGI |
Projets achevés |
2001 |
 |
Project description :
|
|
|
| West quorna compression station |
SCOP |
Projets achevés |
2001 |
 |
Project description :
|
|
|
| Erection of very high voltage installation |
CAMI |
Projets achevés |
2001 |
 |
Project description :
PC contract :
- Procurement,
- Construction,
- Pre-commissioning and start-up,
|
|
|
| West Quorna compression station (3 train compression station ; Iraq) |
SCOP |
Projets achevés |
2001 |
 |
Project description :
EPC project :
- Engineering,
- Procurement,
- Technical assistance and supervision for the complete three compression trains.
|
|
|
| Erection works for two gas turbines frame 9E and its auxiliaries |
General Electric |
Projets achevés |
2000 |
 |
Project description :
- Mechanical erection,
- Turbines & equipments installation,
- Electrical & instrumentation works,
- As built drawings.
|
|
|
| Wind Power Generation Plant (Tunisia) |
MADE |
Projets achevés |
1999 |
 |
 |
Project description :
- Civil work
- Mechanical erection
- Electrical work.
|
|
|
| Construction of the Power Plant STEG |
NUOVO |
Projets achevés |
1998 |
 |
Project description :
- Civil work including:
- Earth moving, miscellaneous roads and network.
- Buildings.
- Concrete Stations.
- Turbine House
- Structural steel work .
- Electromechanical work.
|
|
|
| Power plant transfer From Ghannouch To Zarzis (Tunisia) |
FIAT AVIO -STEG |
Projets achevés |
1998 |
 |
Project description :
- Realization turn key for construction a gas turbine transfer:
- Dismantling of the turbine and all auxiliaries in Ghannouch.
- Packing and transfer of all equipment from Ghannouch to Zarzis.
- Civil Work in Zarzis.
- Erection of the Turbine and annexes.
- Construction of two tanks (Gas oil and fire water)
- Piping work.
- Pre-commissioning, commissioning and start-up.
|
|
|
| Rades Power Plant Step B STEG (Tunisia) |
ANSALDO |
Projets achevés |
1997 |
 |
Project description :
- Erection of the two Turbo-groups.
- 500 Tons Process piping installation.
|
|
|
| Construction of the Power Plant STEG Bir M’Chargua (Tunisia) |
TURBO-TEC. |
Projets achevés |
1996 |
 |
Project description :
- Civil work including:
- Earth moving, miscellaneous roads and network.
- Buildings
- Concrete Stations.
- Turbine House.
- Structural steel work.
- Electromechanical work.
|
|
|
| Compression Stations Cap-Bon -El-Haouaria |
TOZZI sud |
Projets achevés |
1992 |
 |
Project description :
- Supply and erection of electrical facilities.
- Instrumentation work.
|
|
|
| Pétrole et gaz |
| Maamoura and Baraka Development project :provision of onshore facilities |
Eni Tunisia B.V |
Projets en cours |
2008 |
 |
Project description :
EPC for the construction of CPF and Pipeline
- Basic Engineering,
- Detail Engineering,
- Procurement
- Construction.
- Pre commissioning, Commissioning et Start up
|
|
|
| Contract for the survey, supply, the installation and the setting in service of a system of water curtains along the furnaces process |
Sonatrach |
Projets en cours |
2008 |
 |
Project description :
- Basic Engineering,
- Detail Engineering,
- Supply of the pumping system
- Supply and construction of a tank of 42000 m3 .
- Supply and construction of the network fires including .
- system of detection Pre commissioning .
- Commissioning.
- Start up.
|
|
|
| Hasdrubal Gaz plant project |
Petrofac |
Projets en cours |
2006 |
 |
Project description :
- Engineering.
- Procurement,
- Custom clearance and transportation
- Construction
- Pre commissioning and commissioning.
- Miscellaneous services
|
|
|
| Platform fabrication & CPF construction |
Ecumed |
Projets achevés |
2006 |
 |
Project description :
- EPC project of Platforms Fabrication and CPF Construction
|
|
|
| Survey, supply, installation and setting in service of a system of water curtains along the furnaces process |
Sonatrach |
Projets en cours |
2007 |
 |
Project description :
EPC :
- Engineering
- Procurement
- Construction
- Commissioning
|
|
|
| Turn key project for the supply of a firefighting system for the 2 ferries of storage of 3 okbbls Oued Zar |
ENI Tunisie |
Projets achevés |
2007 |
 |
Project description :
- Survey, construction, installation, formation, inspection and test retailed of the whole system
- Supply of the systems of detection and order of fire
|
|
|
| Construction of a flowline 4’’sch. 80 Hammouda 5 Adam 4 et Nour 2 |
ENI Tunisia |
Projets achevés |
2006 |
 |
Project description :
- Right of way opening
- Survey and establishment of the plans of execution of the conducts
- Hydraulic test
- Setting in oil of the pipelines
- Restoration of the places
|
|
|
| Pipeline 4.5* and pig launcher station |
ATHANOR |
Projets achevés |
2002 |
 |
Project description :
- EPC contract
- Engineering,
- Fabrication,
- Erection.
|
|
|
| Bouri field Libya |
KVAERNER |
|
2001 |
 |
Project description :
|
|
|
| West qurona pumps & drivers |
SCOP |
Projets achevés |
2001 |
 |
Project description :
|
|
|
| Fire fighting system |
General Electric |
Projets achevés |
2001 |
 |
Project description :
|
|
|
| BOP piping at Rades II power plant |
SDEM |
Projets achevés |
2000 |
 |
Project description :
Erection of 450 tons BOP piping
|
|
|
| Oued Zar gas compression |
NUOVO PIGNONE |
Projets achevés |
2000 |
 |
Project description :
Erection of 5 compressions units
|
|
|
| Well Heads Platforms Civil Works (Tunisia) |
KUFPEC |
Projets achevés |
1999 |
 |
Project description :
Access road.
Civil Works for the well Head platform.
|
|
|
| Tank Cleaning and Repair 35000m3 (Tunisia) |
MARATHON-ETAP |
Projets achevés |
1999 |
 |
Project description :
Tank Cleaning.
Repair of the tank bottom and first-shell.
|
|
|
| Construction of 110 Km of 16" gas pipeline |
AGIP |
Projets achevés |
1999 |
 |
Project description :
- Civil work
- Pipeline stringing, welding, lowering-in,
- Precommissionning & backfilling
|
|
|
| Filed of Sidi El Kilani (Tunisia) |
KUFPEC |
Projets achevés |
1998 |
 |
Project description :
- Civil Work (drilling platform, access roads, etc...)
- Fabrication and erection of piping.
- Internal painting of oil tank.
- Engineering and Hook-Up realization for the SLK-3 and SLK-4.
- Supply and erection of Fiber Glass flow line.
- Miscellaneous work.
- Erection of water line (2300 ml) Polyethylene.
|
|
|
| LPG Sphere Construction (Tunisia) |
NORGAZ |
Projets achevés |
1998 |
 |
Project description :
- Construction of storage Sphere of 4000 m3 Capacity and transport Piping :
- Civil work: Bored pile and SLABS.
- Mechanical: Steel work, facilities, piping and painting.
- Supply and erection of electrical facilities
|
|
|
| Sidi El Kilani Oil Export Pipeline (Tunisia) |
KUFPEC |
Projets achevés |
1997 |
 |
Project description :
- Turn key construction of the export pipeline Sidi El Kilani:
- Engineering
- Supply of all equipment (pipe, Shipping and booster pumps, etc.)
- Construction of 125 Km of 8" pipeline
- Construction of 3 concentric facilities including pumping metric unit and control.
- Cathodic protection.
|
|
|
| LPG Sphere Construction (Tunisia) |
SIEGAZ |
Projets achevés |
1996 |
 |
Project description :
- Construction of storage Sphere 4000 m3 Capacity and of transport Pipeline :
- Civil work: Bored pile and SLABS.
- Mechanical: Steel work, facilities, piping and painting.
- Supply and erection of electrical facilities.
|
|
|
| ZINNIA |
AGIP |
Projets achevés |
1996 |
 |
Project description :
- Construction of a 6 km pipeline with all process equipment, Turn key project.
|
|
|
| Fabrication Load out sea fastening and Hook-up of 2000 Tones 6 piles off shore plat form |
SEREPT |
Projets achevés |
1995 |
 |
Project description :
- Construction of bridge ASPF3:
- Detail Engineering.
- Procurement of all loose material including Steel Structures, piping, Electricity, instrumentation, etc…
- Fabrication and erection of all structural steel.
- Installation of all equipment.
- Pre commissioning
- Transport and Loading of bridges on cargo-Barge.
- Hook-Up to existing platforms.
|
|
|
| Miscellaneous work associated to Project D.A.A (Development Additional ASHTART) |
SEREPT |
Projets achevés |
1995 |
 |
Project description :
- Engineering and construction of the Separator V600 in SKID.
- Fabrication and erection of piping and supports.
- Engineering, fabrication and erection of the structure for the RIG-2.
|
|
|
| Heavy Fuel Oil Transfer Port of SOUSSE |
STEG |
Projets achevés |
1995 |
 |
Project description :
- Replacement of the pipe 14" and 4" pipeline for unloading facilities (Supply and erection)
- Cathodic Protection of the pipe.
|
|
|
| Oil Terminal La SKHIRA |
TRAPSA |
Projets achevés |
1994 |
 |
Project description :
- Design, supply and construction of the control room equipment.
|
|
|
| Field of BELLI Cap-Bon |
SOIMI |
Projets achevés |
1993 |
 |
Project description :
- Construction of the fire detection and protection system: EPC contract.
- Fabrication and erection of the flow lines and injection lines: EPC contract.
- Erection of drilling platform.
- Civil works (roads, access, buildings, etc…).
- Engineering procurement and installation of all the require utilities.
- Gas compressor hook up (engineering, civil work, piping, electrical and instrumentation).
- Fabrication and erection of water lines.
- Erection of 4” Polyethylene line.
- Supply and erection of the lighting system.
- Miscellaneous work.
|
|
|
| Field of BIR-DRASSEN |
MARATHON |
Projets achevés |
1993 |
 |
Project description :
- Construction of drilling platform.
- Pumping equipment installations.
|
|
|
| STIR |
SABOURIN |
Projets achevés |
1993 |
 |
Project description :
- Supply of 1600 ml pipe API 5L
|
|
|
| Flow Line GREMDA & EL-AIN Development project |
BRITISH GAZ TUNISIE B.G.T |
Projets achevés |
1992 |
 |
Project description :
- Construction of the concentric gas pipeline (Flow line). (6x10)” 10km, (10x14)” 15km.
- HOOK-UP to existing facilities.
- Fabrication and installation of pig Launcher and receiver.
|
|
|
| GREMDA & ELAIN Development project process plant construction |
BRITISH GAZ TUNISIE B.G.T |
Projets achevés |
1992 |
 |
Project description :
- Civil works including (earth work, concrete roads miscellanies).
- Tanks installation.
- Mechanical equipment installation.
- Piping Fabrication and Hook-Up.
- Electrical instrumentation and control work.
|
|
|
| Harbour of GABES |
SIAPE |
Projets achevés |
1992 |
 |
Project description :
- Construction of decanting ammoniac line.
|
|
|
| RHEMOURA Oil Field Development |
TBS |
Projets achevés |
1992 |
 |
Project description :
- Construction of a Pig Launcher PL 21 & PL 22 on skids
- Construction of fence for the site.
- Hook-Up works for the petroleum installations.
|
|
|
| CERCINA 7A Kerkena |
TBS |
Projets achevés |
1992 |
 |
Project description :
- Hook-Up works for Cercina installations.
|
|
|
| Filed of BELLI & ZARZIS |
MARATHON |
Projets achevés |
1991 |
 |
Project description :
- Cathodic protection construction for pipelines.
|
|
|
| Field of EZZAOUIA ZARZIS |
MARATHON |
Projets achevés |
1991 |
 |
Project description :
- Fabrication and erection well head of the flow line at CPF: EPC contract.
- Erection of Flush-line for EZZ-3 to EZZ-9
- Supply and erection of piping heat insulation for the flow line.
- Construction of drilling platform.
- Miscellaneous Civil work construction at EZZ-10.
- Supply and erection of the Mechanical Equipment
- Transfer of Switch Rack.
- Painting of the 6”gas line.
- Internal painting of the oil tank.
- Civil Work for the PTT line.
- Supply and erection of all electrical and instrumentation work of the EZZ8, EZZ9,for CPF.
- Erection of 4000 m2 of Asphalt in the harbour of Zarzis
- Supply and erection of Jurassic manifold.
- Miscellaneous work.
|
|
|
| ONH Centre of Olive Oil storage |
O.N.H |
Projets achevés |
1991 |
 |
Project description :
- Supply and erection of equipment and piping for olive oil storage facilities (Sousse, Sfax, Zarzis).
|
|
|
| station for waste water treatment |
See |
Projets achevés |
1991 |
 |
Project description :
- Fabrication of several equipment and piping for waste water treatment plant.
|
|
|
| FIELD OF SANGAR- ZINNIA Development |
SITEP |
Projets achevés |
1991 |
 |
Project description :
- Engineering and Erection of oil production Facilities:
- Modification of separators.
- Construction of (4) Tanks of 75m3 on skids.
- Equipment erection.
- Prefabrication and erection of piping.
- Instrumentation works.
- Electrical works.
- Control and hydrotest of the piping.
|
|
|
| Usine Industrielle |
| Construction of a phosphoric acid production factory concentrated in the Skhira |
Tifert |
Projets en cours |
2008 |
 |
 |
Project description :
- Engineering, procurement, construction,
- Pre commissioning ,
- Commissioning
- Start up.
|
|
|
| Factory Soda-chlorine SNCPA – kasserine |
INTECSA-UHDE |
Projets achevés |
1996 |
 |
Project description :
- Detail Engineering for the factory (Civil, Structure steel and architectural design).
|
|
|
| Acid storage capacity at Skhira Chemical plant |
SIAPE |
Projets achevés |
1992 |
 |
Project description :
- Turn key project for the increase phosphoric acid storage unit : EPC contract :
- Storage tanks coated with rubber.
- Frameworks and footbridges for agitators.
- Equipment (Pumps, Heater, Agitators.).
- Tubing and thermal insulation.
- Electrical Work
- Instrumentation work.
|
|
|
| Increasing of sulphur storage capacity at Gabes Chemical plant |
SIAPE |
Projets achevés |
1992 |
 |
Project description :
- Turn key project for the Sulphur Storage Unit : EPC contract (Engineering, Procurement, Installation and Start -up):
- Storage hangar construction.
- Conveyors fabrication and installation.
- Fire Protection System.
|
|
|
| Oil refinery de BIZERTE (Tunisia) |
STIR |
Projets achevés |
1992 |
 |
Project description :
- Construction of an Ethyl Storage tank.
|
|
|
| Maintenance |
| Frame work agreement for the supply of engineering work and materials and services |
British Gaz |
Projets en cours |
2007 |
 |
Project description :
- Supply of engineering work and materials and services.
|
|
|
| Autre |
| Logistic and revamping erection HAOUARIA,FERIANA, SBEITLA,KORBA |
Nuovo Pignone |
Projets achevés |
2007 |
 |
Project description :
- Civil works
- Mechanical works
- Electrical works
- Assistance and commissioning
|
|
|
| Spare parts |
SOC |
Projets achevés |
2001 |
 |
Project description :
|
|
|
| En naga North & West Field development Libya area NC 177 process facilities |
PetroCanada |
Projets achevés |
2001 |
 |
Project description :
EPC project :
- Engineering design,
- Procurement,
- Construction,
- Testing and pre-commissioning,
- Commissioning and start up of the CPF including flow lines.
|
|
|
| En naga North & West Field development Libya area NC 177 Crude export pipeline |
PetroCanada |
Projets achevés |
2001 |
 |
Project description :
Turn key construction of the export pipeline :
- Engineering.
- Supply of all equipment (pipe, Shipping and booster pumps, etc.),
- Construction of 100 Km of 12" pipeline.
- Cathodic protection
|
|
|
| Water treatment |
SCOP |
Projets achevés |
2001 |
 |
Project description :
EPC project :
- Basic & Detail engineering of the whole project .
- Supply of equipment & material,
- Supply of spare parts and chemical product for two years.
- Erection of main equipment
- Supervision during the erection, commissioning and start up works for the plant
|
|
|
| Textile factory MONASTIR |
SOMOTEX |
Projets achevés |
1991 |
 |
 |
Project description :
- Design and installation of fire protection system.
|
|
|