Phosphoric Acid Storage
PROJECT

Increasing of Phosphoric Acid Storage Capacity at Skhira Chemical plant
Client
GCT
Location
Tunisia
SCHEDULE
1992 - 1993
SCOPE OF WORK
Engıneerıng, procurement, construction and startup of a 54% and 72% phosphoric acid storage plant:
- 54% phosphoric acid storage tank (4500 m3 capacity)
- Two 72% phosphoric acid storage tanks (4500 m3 capacity each)
- Two phosphoric acid loading pumps 450 m3 /h, 255 KW each.
- Two phosphoric acid heaters (200 KW each)
- Three mixers (2x45 KW and 35 KW).
- Low voltage electrical power distribution systems
- Control, measurement and regulation instruments