ASHTART Offshore Platform
PROJECT
ASHTART Offshore Platform: Fabrication Load out sea fastening and Hook-up of 2000 Tones
Client
ELF / SEREPT
Location
Tunisia
SCHEDULE
1994-1995
SCOPE OF WORK
EPC project :Construction of bridge ASPF3:
Detailed Engineering, Procurement, Construction, Precommissioning, sea fastening, load out, hook up, Commissioning and Start up including:
- Fabrication and erection of steel structure,
- Piping design, procurement, fabrication and installation,
- Process equipment fabrication,
- Equipment installation,
- Electrical and control room installation,
- Electrical and instrumentation works,
- Transport and Loading of bridges on cargo-Barge.
Structure: 1200 tons
Piping: 200 tonsEquipment: 400 tons
Others: 200 tons