Maamoura CPF
![](/images/pireco/oil-gaz/Eni Tunisia B.V/img-eni-tunisia-1.jpg)
PROJECT
Maamoura and Baraka Field Development: Provision of onshore facilities and Services
Client
Eni Tunisia B.V
Location
Tunisia
SCHEDULE
2008-2010
SCOPE OF WORK
EPC of CPF and Pipeline:
- Engineering, procurement, construction, transport, installation commissioning, and start-up for the following facilities:
- 2 pipeline 10” and 12” interconnecting the Tazerka landfall of the offshore sea lines to the Treatment Plant
- Treatment Plant (CPF) with receiving stations, Oil treatment and Stabilization train, Gas compression and treatment train, LPG treatment train, Storage and loading facilities, Metering Systems, Power supply, all associated Utilities, and all required safety, Control and Communication systems
- New export gas pipeline 8” interconnecting the Treatment Plant to the STEG network
- Truck loading facilities with metering system for LPG (BUTAPRO1), Stabilized Crude oil, Treated produced water