Ennaga CPF
PROJECT

Ennaga North & West Field development Libya area NC 177: Process facilities (CPF)
Client
IPLL
Location
Libya
SCHEDULE
2001-2002
SCOPE OF WORK
The project installations include the crude oil wellhead facilities, the gathering flowlines and all the process and utility equipment necessary to match the export oil BS&W content, H2S concentration and RVP requirements.
The scope of work of this project includes :
- Engineering: Front end engineering, basic design with different disciplines: civil works, electrical process HAZOP and HAZID study.
- Procurement of all equipment balanced plant
- Construction: Construction of a complete CPF for 20000 bopd including realization of equipment of the well point flow lines separation, Coalescer storage tank, flair, control system, utility…
- Pre commissioning, commissioning, start up and assistance for operation.