8" Crude Oil Pipeline

PROJECT 

Sidi El Kilani Crude Oil Export Pipeline (126 Km of 8" pipeline)

Client

KUFPEC

Location

Tunisia

SCHEDULE

1998-1999

SCOPE OF WORK

  • Engineering.
  • Supply of all equipment (pipe, Shipping and booster pumps, etc.)
  • Construction of 126 Km of 8" pipeline and related facilities
  • Construction of 3 concentric facilities including pumping metric unit and control.
  • Cathodic protection.