MLE Project

PROJECT
MLE PROJECT: TurboCompressors and air coolers Erection & relevant auxiliaries
Client
SAIPEM
Location
Algeria
SCHEDULE
2010-2011
SCOPE OF WORK
- Erection of the Nos. 3 Turbo cabinets (PGT25 gas turbines)
- Erection of the Nos.6 Air coolers
- Installation of Electrical/Instrumentation materials related to the TKs units and air coolers.
- Piping Prefabrication and Erection
- Area 1: Total Weight (Kg): 1 419 316,6
- Total Inch: 56 844,75
- Area 2: Total Weight (Kg): 148 820,9
- Total Inch: 11 639
- Pre-commissioning