SCOPE OF WORK

Engineering, Procurement and transportation (till the site) of 5 compression stations, 19 Km of 6” pipeline and 2x8 Km of 33 Kv Overhead Line single term.

Engineering

  • Basic and detailed design of 19 Km of 6” seamless gas pipe line, 2x8 Km of 33 KV Overhead Line single term, of earthing system, of lighting system, HVAC system for 5 electrical and control buildings.
  • Civil detailed design for foundations and buildings.

Procurement

  • 19 Km of seamless pipelines including Pig launcher and receiver skids and cathodic protection system
  • Over headline system including Towers, conductors fittings and insulators
  • 1400 Ton of civil Re-bars and civil consumables.
  • Earthing system material including: 18 Km of earthing conductors and accessories
  • 300 Ton of cable trays and ladders
  •  750 Ton of piping supports

Transportation

  • Customs clearance and Inland transportation of GE equipment (approx. 75 000 CBM)
  • Maritime Transportation of PIRECO material (approx. 170 container 40 foot)
  • Customs clearance and Inland transportation of PIRECO material