EPC Contract for Fire Protection & Cooling System of LNG tanks at GL1Z complex

Client

Sonatrach

Location

Algeria

SCHEDULE

2008-2011

SCOPE OF WORK

Pumping System "8 Unit Motor Pumps 2685m3 / h, Network of 2km of 38", water storage tank 35000m3, Detection and Control System, Electrical Room:

  • Basic and Detailed engineering of the new system
  • Supply and installation of a new water storage tank (35000m3)
  • Complete design of eight main pumps and two Jockey pumps
  • Study, Supply and Installation of the inlet piping of pump,
  • Installation and commissioning of the sprinkler system
  • Providing spare parts for installation and commissioning
  • Sonatrach personnel Training.