624 MW Gas Turbine Power Plant
PROJECT

Mornaguia Gas Turbine Power Plant 624 MW ( 2 GT x 312 MW)
Client
ANSALDO
Location
Tunisia
SCHEDULE
05/2018 (ongoing)
SCOPE OF WORK
The performance of all Civil Engineering and Electromechanical works including two groups with a unit capacity of 312 MW, their direct auxiliaries as well as the systems and ancillary works including HV evacuation lines, connection to the existing transformer station, Administrative and technical buildings as well as the supply of MESA 1 & 2 structure, pipe rack and cladding related to the machine room, Mesa 1 & 2, Workshop and Shop.