256 MW Gas Turbine Power Plant
PROJECT

Fast track Project: BIR MCHERGUA Gas Turbine Power Plant 256 MW (2 GT GE frame 9E x 128 Mw )
Client
GE
Location
Tunisia
SCHEDULE
- 11-2012 / 06-2013
- 10-2013 / 04-2014
SCOPE OF WORK
Phase 1:
- Civil engineering and works (including earth moving, miscellaneous roads and network, Concrete Stations, Turbine House)
- Site assembly, testing and industrial commissioning of electro-mechanical equipment, as well as auxiliary and ancillary works
- Steel Structure works
- Piping works
- Electrical works