256 MW Gas Turbine Power Plant

PROJECT

Fast track Project: BIR MCHERGUA Gas Turbine Power Plant 256 MW (2 GT GE frame 9E x 128 Mw )

Client

GE

Location

Tunisia

SCHEDULE

  • 11-2012 / 06-2013
  • 10-2013 / 04-2014

SCOPE OF WORK

Phase 1:

  • Civil engineering and works (including earth moving, miscellaneous roads and network, Concrete Stations, Turbine House)
  • Site assembly, testing and industrial commissioning of electro-mechanical equipment, as well as auxiliary and ancillary works
  • Steel Structure works
  • Piping works
  • Electrical works