360 MW Gas Turbine Power Plant

PROJECT

THYNA Gas Turbine Power Plant 360 MW (3 GT GE frame 9E x 120 Mw )

Client

GE

Location

Tunisia

SCHEDULE

  • Phase 1: 2004
  • Phase 2: 2006
  • Phase 3: 2008

SCOPE OF WORK

  •  Civil works ( Earth Works, foundations, buildings, roads, turbine house, etc.. )
  • Steel Structure detailed design, fabrication and erection.
  • Turbines and Equipment Installation
  • Storage tanks design, fabrication and erection
  • Piping detailed design, fabrication and erection
  • Electrical and Instrumentation works.
  • Transformer station
  • Auxiliary station
  • Technical Assistance to commissioning and Start-up